TODAY, MARCH 13, 2019, THE NEW PUMP STATION ON THE BROAD RIVER WAS TURNED ON FOR THE FIRST TIME FOR TESTING.n
n
The Town of Winnsboro funded this approximately $12 million dollar project, encompassing a new raw water intake pipe and construction of this pump station, with a SRF State Drinking Water Revolving Loan Fund loan through EPA.n